1. Project Overview
Plot No. 2 has a total construction area of 85,000 square meters, including approximately 29,000 square meters of underground construction area and approximately 56,000 square meters of above-ground construction area. It has one underground floor with a height of 5.5 meters (6.1 meters in some areas). There are a total of 21 buildings, each with 6 above-ground floors and one underground floor plus a equipment floor, reaching a height of 25.6 meters.
Plot No. 4, Section 2, has a construction area of 105,135 square meters, including approximately 26,230 square meters of underground construction area and approximately 78,905 square meters of above-ground construction area. It has one underground floor with a height of 5.35 meters (5.45 meters in some areas). There are a total of 7 above-ground buildings (4-13#, 4-15~20#), each with 26 floors and one underground floor plus an equipment floor, reaching a height of 82 meters.
Suzhou Jinmao Project Scope of Work: Plot No. 2 includes the following systems: domestic water supply, rainwater drainage, rainwater recycling, sewage and wastewater, and pressure drainage; air supply and exhaust, smoke exhaust; power and lighting distribution boxes (cabinets), cable trays, cable troughs; electric wires, cables, busbars, lighting fixtures, switches, and sockets in non-精装 areas; emergency lighting system; weak current system, and fire alarm system cable troughs and cable tray installation. Plot No. 4 includes the following systems: domestic water supply, rainwater drainage, rainwater recycling, sewage and wastewater, and pressure drainage; air supply and exhaust, smoke exhaust; power and lighting distribution boxes (cabinets), cable trays, cable troughs; electric wires, cables, busbars, lighting fixtures, switches, and sockets in non-精装 areas; emergency lighting system; weak current system, and fire alarm system cable troughs and cable tray installation; civil air defense electrical, water supply and drainage, and ventilation engineering.
Construction Unit: Suzhou Anmao Real Estate Co., Ltd.
Design Unit: Qidi Design Institute
Supervision Unit: Suzhou Construction Engineering Supervision Co., Ltd.
Suzhou Tianhe Engineering Management Consulting Co., Ltd.
Construction Unit: Shaanxi Construction and Installation Group Co., Ltd.
2. Project Management System
Project Manager: Xue Xinming
Deputy Project Manager, Business: Xie Baohua
Technical Leader: Chen Long
Professional Foremen: Li Fei, Xiao Yonghua, Liu Weibin, Zhao Fei,
Materials Officer: Qi Qin
Safety Officer, Quality: Fang Feng
3. Current Construction Progress
This project is divided into three sections with two contracts: The demonstration area is already in use. Plot No. 2’s 21 multi-story buildings (6~8 floors) have completed all contract items. Plot No. 4 has a total of 7 high-rise buildings; the energy equipment room in the south section is now in use. The north section’s underground pipelines are all complete and are undergoing specialized acceptance. The roof technology water system is pending acceptance before construction.