Construction Progress Report: Xi'an Railway Station North Square and Surrounding Municipal Infrastructure Projects
Release time:
2020-08-27
Source:
Production Management Department
1. Project Overview:
The Xi'an Railway Station North Square Comprehensive Renovation Project is located south of the world cultural heritage site Danfeng Gate, north of the newly built north station building, adjacent to the Longhai Railway Line, east of Jianqiang Road, west of Taihua South Road, and adjacent to the underpass section of Ziqiang Road. This project is directly connected to Metro Lines 4 and 7.
The Xi'an Railway Station North Square Comprehensive Renovation Project is a crucial "bridge-building operation" in the heart of Xi'an. It is an important practice to improve the traffic organization, tourism services, and regional commercial functions in this area, promote the "station-city" integrated concept, and represents a significant opportunity for the revitalization of the ancient city.
As an important part of the Xi'an Railway Station renovation and expansion project, this project is a passenger transport complex connecting various modern public transportation modes. The building structure type is reinforced concrete frame structure, with partial steel structure. It has one above-ground floor and three underground floors, with a total construction area of approximately 146,800㎡. The underground first floor mainly serves passengers entering the railway station, with a drop-off area for cars and a bus hub. The underground second floor mainly serves passengers leaving the railway station, with a transfer hall, taxi parking area, taxi pick-up area, and social vehicle parking lot. The underground third floor is a social vehicle parking lot.
The Ziqiang East Road renovation project starts from Weiyang Road in the west and extends to Taihua Road in the east, with a total length of approximately 2.3 kilometers of newly built and renovated lines, including approximately 1.6 kilometers of tunnels. The planned road red line width is 60 meters, and the grade is a main urban road. The tunnel design speed is 50 kilometers/hour, and the ground auxiliary road design speed is 40 kilometers/hour. It adopts an underpass form to pass under the north square of the railway station. The main line of the underpass has two-way four lanes and an emergency parking lane. In addition to a pair of entrances and exits on Ziqiang East Road, a pair of entrances and exits are also set up on Jianqiang Road (north of Ziqiang East Road), involving approximately 600 meters of Jianqiang Road renovation. The Weiyang Road/Ziqiang East Road intersection and the Jianqiang Road/Ziqiang East Road intersection are both plane intersections.
2. Project Scope:
(1) Water Supply and Drainage Engineering
This mainly includes the domestic water supply system, domestic drainage system, sewage and waste water lifting system, and rainwater system.
(2) Ventilation and Air Conditioning Engineering
This includes multi-unit air conditioning systems, ventilation systems, and smoke exhaust systems.
(3) Electrical Engineering
This includes the power distribution system, power system, lighting system, lightning protection and grounding system.
(4) Fire Protection Engineering
Indoor fire hydrant system, automatic sprinkler fire extinguishing system, and gas fire extinguishing system.
(5) Intelligent Engineering
This includes integrated wiring systems (network and Tel), wireless intercom systems, video surveillance systems, public broadcasting systems, intelligent guidance and management systems, parking management systems, intelligent bus electronic sign systems, and fire automatic alarm and fire linkage systems.
(6) Building equipment energy-saving control and management system, energy consumption monitoring system.
Construction Unit: Xi'an Rail Transit Xi'an Station Development Co., Ltd.
Xi'an Municipal Bureau of Housing and Urban-Rural Development
Design Unit: China Construction Northwest Design and Research Institute Co., Ltd.
Shanghai Municipal Engineering Design Research Institute (Group) Co., Ltd.
Supervision Unit: Xi'an Zhongheng Municipal Engineering Supervision and Consulting Co., Ltd.
Xi'an High-tech Construction Supervision Co., Ltd.
Construction Unit: Shaanxi Construction Engineering Group Co., Ltd.
Shaanxi Construction Engineering Sixth Construction Group Co., Ltd.
Shaanxi Construction Engineering Mechanization Construction Group Co., Ltd.
Shaanxi Construction Engineering Installation Group Co., Ltd.
Shaanxi Huashan Bridge Group Co., Ltd.
Shaanxi Provincial Institute of Architectural Science
Project Management System:
Project Manager: Fan Yuanjian
Technical Director: Li Xiaxi
Business Manager: Chai Zhimin
Quality Manager: Wang Pengxi
Professional Foremen: Lv Jinxi, He Chengjun, Han Yong, Huang Hongqi, Qin Nan, Chen Gaofeng
Materials Supervisor: Zhao Dan, Hu Shaoqiu
Safety Officer: Hou Guiping, Liu Weifeng
Quality Inspector: Song Peng
Documentarian: Ma Jiaoyang
3. Current Construction Progress:
This project is divided into municipal and building sections. The overall project is in the stage of gradual main body construction. Currently, the municipal section, the Ziqiang East Road tunnel main body, has completed 15% of the pre-embedded work. The building section, Xi'an Railway Station North Square, has completed 10% of the main body pre-embedded work.
Related News