Quality Improvement Year: The Bangladesh Natural Gas Pipeline EPC Project Achieves 'Double Over Half' Targets
Release time:
2024-09-02
Source:
International Business Department

Recently, the Shaanxi Construction Installation Group's Bangladesh natural gas pipelineEPC project completed the construction task of the East Bridge section,This marks the project's achievement ofthe “schedule and progress” double halfway goal, laying a solid foundation for subsequent construction。
The Bangladesh natural gas pipeline EPC project is located in Dhaka, the capital of Bangladesh. It is the main artery of Bangladesh's “East-West Gas Transmission” strategy and a key national project. It is also the basic energy supply pipeline for the western industrial development of Bangladesh. The construction content includes two valve chambers and 5 kilometers of pipeline laying. After the completion of this project, it will be of great significance to promoting the safety of Bangladesh's energy supply and its economic and social development.
Since the start of the project construction, the project team has scientifically organized the construction, coordinated resources, continuously improved the level of refined management, adopted the mode of factory prefabrication and modular construction, formed an organic industrial chain and orderly flow-type operation, saving resources while improving installation efficiency and quality. Faced with the technical difficulties of pipeline and expansion bend construction in the bridge section, the project department deepened the design scheme and adopted methods such as local dredging, floating boat bow and stern eight-character anchor throwing, and modular prefabrication to overcome various unfavorable factors such as riverbed rise, sudden rise in water level and flow velocity, and multi-party cross-construction. The project successfully completed the node target, receiving high praise from the owner, demonstrating its excellent overseas construction General Strength.
Related News
2023-12-18